Verified Document

Best Practices In Supply Chains Essay

Related Topics:

Supplies, MaterialsB) Parts suppliers, metal shapers, tire makers, etc.

C) To make a profit and establish relationships with automakers and other customers

D) Shippers might want to make more profit while people using the shipper want to keep costs down

E) It can slow or shut down the movement of parts and supplies, like with a hurricane or volcano eruption

A) The service, paperwork, pens, mail service, etc.

B) Yes. Each firm is trying to provide a service for a profit . . . the loan, underwriters, etc.

C) The goods of service supply chains are more abstract whereas they are more physical and tangible with product supply chains

Shipping. It used to be just cars and trucks but now they use bigger trucks and planes

A vertical company would have a singular supply chain system. A horizontal one would probably have a supply chain system for each smaller company, or they would go outside the company.

Absolutely. They would tend to have their own system and it needs to be fluid and work well

6) Lack of metal for the cans, a bad peach crop, a breakdown or crash of a peach shipment, etc.

7) Having things close means lack of geographic distance from the main base. Having them distributed means less time to get to customers and less impact if one warehouse goes down and is unable to ship. Other warehouses can pick up the slack.

Chapter Two

Question One

A) They have an array of products, some with high margins and some with low margins. The customer base of SteelWorks has a wide array of desires and needs and thus this is seemingly creating the inventory issues.

B) They sell a wide array of products. Not based on the data provided, due to the separate and different nature of the two organizations in question

C) Entirely too much. They can do the 20% reduction if they do it the right way

D) Yes. There needs to be a tracking of the time and money spent by that division.

2) Perhaps the best way to is to reduce variability where it is possible. If not, there has to be adjustment to the variability that is or could happen or customers will have to back-order or cancel (which is already happening 30% of the time)

3) Inventory levels provide a response time for when customer service receives a request for a part. A balance has to be struck between having enough inventory on hand but not too much

4) Lead time would indicate how much time is needed to provide the order as requested and promised. Less lead time would mean higher variability and thus the need for higher inventory levels.

5) Managing the service level and expectations in a way that expands the time window promised and delivered would create more lead time and thus reduce the need for higher inventory

6) The first of those is safety stock . . . this is what the distributor needs to keep on hand when preparing for deviations from average demand during lead time. The latter is the expected level of inventory immediately after receiving the order, or the maximum level. The first one was the minimum.

7) The first is the expected level of inventory when receiving an order and the latter speaks to...

Both involve the average inventory level.
8)

Tires

Wheels

Hubcaps

Caps for car tire innertubes

Polish

Tires and wheels are highest because they need to be variable no matter what due to their importance and price point. The other items are mostly for show and thus are less important

9)

A) Overall, the cross-dock with zero time would be better since the goods would go straight from an income shipment to the stores. If they go to the lead time is added between the retail outlets and manufacturing facility, both stores would see longer waits

B) The retail outlets

10) Longer but less variable. Variability should always be reduced when possible

11) Long-term storage for stalled goods, etc.

12) It shows the minimum cost for the situation involved

13) It is very much a risk vs. reward situation. Payouts will be great when things go well but the valleys will be low as well

14) A) Going from several warehouses to one warehouse B) Using an annual forecast instead of a semi-annual one C) Staying away from products that are similar yet different

15) Assuming that two store shave similar level of service, service levels and pricing structures, they would be positively correlated. However, if one store does a sale and the other does not, there would probably be a negative correlation.

16) Projections at the onset would be based on things like focus groups and other realms of perceived demand. During the middle, it would be based on growing and prior sales. At the end, it would be based on an expected decline as the new product comes out

17)

A) It would generally be favorable . . . except when things are bad. If one rises, they all rise. If they fall, they all fall.

B) Table 2-12 (inbound/outbound) is the more attractive one

C) It could be useful given the guarantee and if the cost could be passed to the customer

Chapter Three

1) It has to be checked to make sure that the current setup is the right one. Requirements can change due to changes in cost, needed lead time, customer demands and so forth

2) Everyone would be involved on some level. Operations would be able to report things that go wrong or right, sales would have to manage expectations based on the network in place, marketing would have to do the same, etc.

3) Steps would include deciding where that warehouse would be, how service levels would be kept in check, how to meet consumer demand, how to transition from the five warehouses to the single one, etc. The major downside to a single warehouse is that all orders are on hold if something happens at that warehouse. An upside is that there is one warehouse and thus consistency in operations is easier to uphold

4) See below

a. The size of what is being transported, union/labor issues, shipping concerns

b. State regulations, whether drug is lifesaving/necessary

c. Centralized location probably needed due to volume that would be in play (cost per item, etc.)

d. Much the same as automobiles, laws at the federal/state/international level, etc.

e. Handling bulk of the same…

Cite this Document:
Copy Bibliography Citation

Related Documents

Supply Chains Companies Have Been
Words: 1000 Length: 3 Document Type: Term Paper

From this basis of trust and a concentrated focus on streamlining processes that enable communication between manufacturers and suppliers, technology is often introduced, albeit selectively. It is erroneous to look at technology in the context of supply chain management as the panacea; rather it needs to be seen as the enabler of efficiency and inter-supply chain collaboration, quality management, and supplier relationship management. Technology is only applied to supply chains after the fundamental relationships and trust

Best Practices in Supply Chain Management
Words: 1274 Length: 4 Document Type: Case Study

CJ Industries CaseI. Major Facts1. CJ Industries (CJI) has been awarded a 5-year contract with Great Lakes Pleasure Boats amounting to U.S. $10 million per year, commencing in July 2008.2. CJI will be providing key engine components, including a bilge pump currently purchased from Heavey Pumps.3. The contract with Great Lakes represents approximately 30% of CJI\\\'s annual sales.4. New demand for bilge pumps will be 50 per month, potentially more

Best Practices in Supply Chain Management
Words: 5471 Length: 15 Document Type: Essay

Transitioning of the Defense Transportation System Toward Complementing Best Practices in Supply Chain Management Efficiently and Securely Distribution managers need to appreciate that management of defense supply chains is a rapidly-growing global phenomenon, with an overlap existing in management levels; right from the strategic national-level stakeholders to lower sustainment units at the activity levels. Strategic distribution changes have the potential of immensely impacting tactical implications. This paper aims to help

Supply Chain Management Best Practices
Words: 1164 Length: 4 Document Type: Research Paper

Best PracticesManaging high-profile projects can be a challenge, especially for projects requiring significant resources, involving multiple stakeholders, and posing various risks, such as supply chain disruptions, cost overruns, or reputational damage. Therefore, project managers must be equipped with the right tools and techniques to effectively manage these projects. This paper will discuss how to manage such projects with respect to best practices, key challenges, and PMBOK.Managing High-Profile ProjectsOne best practice

Defining the Future of Integrated Supply Chains
Words: 1116 Length: 4 Document Type: Term Paper

Supply Chain Integration Defining Integrated Supply Chains in the 21st Century Collaboration and the ability to orchestrate complex purchasing, procurement, quality management and fulfillment strategies typify integrated supply chains today. These lessons learned and more are found in the article, Integrated Supply Chains to be Explored (Johnson, 2007). Also alluded to in the article is the concept of having a 360 degree view of global supply chains, with the added benefit of

Best Buy Purchasing and Supply Management
Words: 2932 Length: 10 Document Type: Term Paper

Purchasing and Supply Management at Best Buy Today Headquartered in Richfield, Minnesota and founded in 1966, Best Buy Co., Inc. (hereinafter alternatively “the company” or “Best Buy”) is a leading retailer in electronics and other consumer products that competes throughout North America and Mexico today. As of early 2019, Best Buy operated nearly 1,200 large format as well as 51 small-format retail stores (Company profile, 2019). Despite its success in growing